{"id":10313,"date":"2025-12-01T16:51:43","date_gmt":"2025-12-01T13:21:43","guid":{"rendered":"https:\/\/avangardtech.com\/vesta\/?post_type=portfolio&#038;p=10313"},"modified":"2025-12-14T13:20:52","modified_gmt":"2025-12-14T09:50:52","slug":"preparation-of-project-identification-document-and-feasibility-study-for-resilient-infrastructure-world-bank-funded","status":"publish","type":"portfolio","link":"https:\/\/vesta-eng.com\/en\/portfolio\/preparation-of-project-identification-document-and-feasibility-study-for-resilient-infrastructure-world-bank-funded\/","title":{"rendered":"Preparation of Project Identification Document and Feasibility Study for Resilient Infrastructure \u2013 World Bank-Funded"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"10313\" class=\"elementor elementor-10313\" data-elementor-post-type=\"portfolio\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4cecd4e e-flex e-con-boxed e-con e-parent\" data-id=\"4cecd4e\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-5e1a96d e-con-full e-flex e-con e-child\" data-id=\"5e1a96d\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf5b675 elementor-widget elementor-widget-heading\" data-id=\"bf5b675\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Preparation of Project Identification Document and Feasibility Study for Resilient Infrastructure \u2013 World Bank-Funded<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c6bd344 elementor-widget-divider--view-line_icon elementor-view-default elementor-widget-divider--element-align-center elementor-widget elementor-widget-divider\" data-id=\"c6bd344\" data-element_type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t\t<div class=\"elementor-icon elementor-divider__element\">\n\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-star\"><\/i><\/div>\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b6e4a59 color-scheme-inherit text-left elementor-widget elementor-widget-text-editor\" data-id=\"b6e4a59\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><strong>Project Location:<\/strong> Turkey<\/p><p><strong>Consulting Firm:<\/strong> Vesta (Sub-consultant of Protek-Yapi)<\/p><p><strong>Start Date:<\/strong> 2025<\/p><p><strong>Duration of Consultancy Services:<\/strong> 6 months<\/p><p><strong>Clients:<\/strong> Bal\u0131kesir Metropolitan Municipality, Ordu Metropolitan Municipality, \u0130zmir Metropolitan Municipality, Tokat Municipality<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5588364 elementor-widget-divider--view-line_icon elementor-view-default elementor-widget-divider--element-align-center elementor-widget elementor-widget-divider\" data-id=\"5588364\" data-element_type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t\t<div class=\"elementor-icon elementor-divider__element\">\n\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-star\"><\/i><\/div>\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-83b9acc color-scheme-inherit text-left elementor-widget elementor-widget-text-editor\" data-id=\"83b9acc\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>This project was undertaken to enhance the emergency response capacity of municipalities and included financing for the procurement of vehicles and equipment required to respond to wildfires, floods, storms, and earthquakes. By strengthening the capabilities of municipal fire brigades, the project aimed to improve the preparedness and resilience of municipalities against increasing risks associated with climate change and extreme weather events.<\/p><p>The final report provided a multidimensional assessment enabling municipalities to plan and prioritize their investments in emergency response infrastructure. It offered a data-driven framework to align operational needs with strategic decision-making.<\/p><p><strong>Services Provided<\/strong><\/p><ul><li><strong>Assessment of municipal capacity:<\/strong> Review of institutional, managerial, and operational capabilities of municipalities.<\/li><li><strong>Comprehensive evaluation of municipal fire brigades:<\/strong> Analysis of existing capabilities and equipment for disaster response.<\/li><li><strong>Needs analysis through engineering assessments and stakeholder engagement:<\/strong> Identification and prioritization of investment requirements.<\/li><li><strong>Estimation of required investment costs.<\/strong><\/li><li><strong>Economic and financial analysis:<\/strong> Evaluation of feasibility and potential return on investment.<\/li><li><strong>Assessment of social and environmental impacts.<\/strong><\/li><li><strong>Project management, implementation, monitoring, and evaluation.<\/strong><\/li><li><strong>Preparation of draft and final reports:<\/strong> Consolidation of findings and provision of practical recommendations for decision-making and project implementation.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-16d0798 e-con-full e-flex e-con e-child\" data-id=\"16d0798\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-95d06a0 elementor-widget elementor-widget-theme-post-featured-image elementor-widget-image\" data-id=\"95d06a0\" data-element_type=\"widget\" data-widget_type=\"theme-post-featured-image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/z8.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-title=\"z8\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTAzMTgsInVybCI6Imh0dHBzOlwvXC92ZXN0YS1lbmcuY29tXC9lblwvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyNVwvMTJcL3o4LmpwZyJ9\">\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"560\" height=\"558\" src=\"https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/z8.jpg\" class=\"attachment-full size-full wp-image-10318\" alt=\"\" srcset=\"https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/z8.jpg 560w, https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/z8-300x300.jpg 300w, https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/z8-150x149.jpg 150w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/>\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Project Location: Turkey Consulting Firm: Vesta (Sub-consultant of Protek-Yapi) Start Date: 2025 Duration of Consultancy Services: 6 months Clients: Bal\u0131kesir<\/p>\n","protected":false},"featured_media":10318,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[137,128],"class_list":["post-10313","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-economic-services","project-cat-implemented-projects"],"_links":{"self":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio\/10313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/comments?post=10313"}],"version-history":[{"count":15,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio\/10313\/revisions"}],"predecessor-version":[{"id":10596,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio\/10313\/revisions\/10596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/media\/10318"}],"wp:attachment":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/media?parent=10313"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/project-cat?post=10313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}