{"id":10337,"date":"2025-12-01T17:04:24","date_gmt":"2025-12-01T13:34:24","guid":{"rendered":"https:\/\/avangardtech.com\/vesta\/?post_type=portfolio&#038;p=10337"},"modified":"2025-12-31T10:53:48","modified_gmt":"2025-12-31T07:23:48","slug":"engineering-services-for-edremit-solar-power-plant-18-3-mw-design-feasibility-environmental-social-management-plan-and-stakeholder-engagement-program","status":"publish","type":"portfolio","link":"https:\/\/vesta-eng.com\/en\/portfolio\/engineering-services-for-edremit-solar-power-plant-18-3-mw-design-feasibility-environmental-social-management-plan-and-stakeholder-engagement-program\/","title":{"rendered":"Engineering Services for Edremit Solar Power Plant (18.3 MW) \u2013 Design, Feasibility, Environmental &#038; Social Management Plan, and Stakeholder Engagement Program"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"10337\" class=\"elementor elementor-10337\" data-elementor-post-type=\"portfolio\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0c609af e-flex e-con-boxed e-con e-parent\" data-id=\"0c609af\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-3fcd0c2 e-con-full e-flex e-con e-child\" data-id=\"3fcd0c2\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3589420 elementor-widget elementor-widget-heading\" data-id=\"3589420\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Engineering Services for Edremit Solar Power Plant (18.3 MW) \u2013 Design, Feasibility, Environmental &#038; Social Management Plan, and Stakeholder Engagement Program<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-93d7833 elementor-widget-divider--view-line_icon elementor-view-default elementor-widget-divider--element-align-center elementor-widget elementor-widget-divider\" data-id=\"93d7833\" data-element_type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t\t<div class=\"elementor-icon elementor-divider__element\">\n\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-star\"><\/i><\/div>\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-892e2a5 color-scheme-inherit text-left elementor-widget elementor-widget-text-editor\" data-id=\"892e2a5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><strong>Project Location:<\/strong> Turkey<\/p><p><strong>Consulting Firm:<\/strong> Vesta (Sub-consultant of Protek-Yapi)<\/p><p><strong>Start Date:<\/strong> 2025<\/p><p><strong>Duration of Consultancy Services:<\/strong> 5 months<\/p><p><strong>Client:<\/strong> Van Municipality, Turkey<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e4855df elementor-widget-divider--view-line_icon elementor-view-default elementor-widget-divider--element-align-center elementor-widget elementor-widget-divider\" data-id=\"e4855df\" data-element_type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t\t<div class=\"elementor-icon elementor-divider__element\">\n\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-star\"><\/i><\/div>\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14ccb8f color-scheme-inherit text-left elementor-widget elementor-widget-text-editor\" data-id=\"14ccb8f\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>This project was undertaken to facilitate financing for the ground-mounted <strong>18.3 MW solar power plant<\/strong> in Edremit. The objective was to prepare complete engineering documentation in both Turkish and English, aligned with international financial institution standards, ensuring compliance with Turkish energy, planning, environmental, and safety regulations, and supporting the acquisition of an <strong>investment incentive certificate<\/strong> from the Ministry of Industry.<\/p><p><strong>Key Project Deliverables<\/strong><\/p><ul><li><strong>Electrical Project:<\/strong> Including drawings, single-line diagrams, grounding system, cabling, and inverter stations.<\/li><li><strong>Static Structural Project:<\/strong> Covering steel structures, foundations, and load calculations based on wind and snow conditions.<\/li><li><strong>Energy Transmission Lines Project:<\/strong> Designed in accordance with TE\u0130A\u015e and VEDA\u015e grid connection standards.<\/li><li><strong>Investment Incentive Certificate Application:<\/strong> Preparation of the complete submission package for the Ministry.<\/li><li><strong>Feasibility Report:<\/strong> Analysis of site topography, geotechnical conditions, and solar resources; selection of cost-effective modules and inverters; 25-year cash flow projection including internal rate of return (IRR) and payback period calculations.<\/li><li><strong>Regulatory Compliance:<\/strong> Ensuring adherence to occupational safety laws and Turkish legal requirements.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-280f81b e-con-full e-flex e-con e-child\" data-id=\"280f81b\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-18dd784 elementor-widget elementor-widget-theme-post-featured-image elementor-widget-image\" data-id=\"18dd784\" data-element_type=\"widget\" data-widget_type=\"theme-post-featured-image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/Z12.png\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-title=\"Z12\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTAzMzgsInVybCI6Imh0dHBzOlwvXC92ZXN0YS1lbmcuY29tXC9lblwvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyNVwvMTJcL1oxMi5wbmcifQ%3D%3D\">\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"478\" height=\"331\" src=\"https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/Z12.png\" class=\"attachment-full size-full wp-image-10338\" alt=\"\" srcset=\"https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/Z12.png 478w, https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/Z12-300x208.png 300w, https:\/\/vesta-eng.com\/en\/wp-content\/uploads\/2025\/12\/Z12-150x104.png 150w\" sizes=\"auto, (max-width: 478px) 100vw, 478px\" \/>\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Project Location: Turkey Consulting Firm: Vesta (Sub-consultant of Protek-Yapi) Start Date: 2025 Duration of Consultancy Services: 5 months Client: Van<\/p>\n","protected":false},"featured_media":10338,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[139,137,129],"class_list":["post-10337","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-consultancy-and-design-services-for-renewable-energy-and-energy-efficiency","project-cat-economic-services","project-cat-ongoing-projects"],"_links":{"self":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio\/10337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/comments?post=10337"}],"version-history":[{"count":17,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio\/10337\/revisions"}],"predecessor-version":[{"id":10717,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/portfolio\/10337\/revisions\/10717"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/media\/10338"}],"wp:attachment":[{"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/media?parent=10337"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/vesta-eng.com\/en\/wp-json\/wp\/v2\/project-cat?post=10337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}